When Do I Need a Permit?
The following work requires obtaining a permit in Folcroft Borough:
- Any concrete
- Roofing
- Shingles
- Siding
- Windows
- Exterior doors (not interior)
- Kitchen remodeling (cabinets, plumbing, electrical etc)
- Outlets and switches
- Light fixtures
- Hard wiring
- Sinks and tubs
- Sewer work
- Fences
- Decks
- Sheds
- Additions
- Driveways (paving)
- French drains
- Service cables
- Circuit boxes
- Solar panels
- Framing
- Ramps
- Retaining walls
- Water heaters
- HVAC
- Split systems
- Boilers
- Most window installations
Doing the work yourself does not eliminate the need for permits. Please note that a qualified Borough inspector must review the project and conduct inspections. Permit fees are calculated by cost.
Please note that this list may not be fully comprehensive and it is always advisable to contact the Borough directly for confirmation about whether or not your project requires permits. Please call (610)522-1305 during regular business hours or email rpetty@folcroftborough.org for more definitive information.